We’re pleased to announce that 2021 was another hugely successful year for us. Turnover was up 50% and profits were up 600% from the previous year. This is a reflection of the hard work and dedication shown by all our staff. We are grateful to all our clients, suppliers and staff for their respective contributions to our success over the last year.
Plate Bearing Testing
To meet the needs of the increasing demand for offsite construction for modular structures, highlighted by the government’s awarding of £3bn modular schools framework, we have invested in another set of fully accredited plate bearing testing equipment for assessing the suitability of temporary foundations or siting crane outriggers.
Of course, for those larger projects, we can offer full geo-environmental investigations, topographic surveys, utility surveys, laboratory testing, infiltration testing and CBR testing, all using our own equipment.
For more information, please contact Steven Partridge – 01296 739413
Under Pressure

We do a lot of plate bearing and CBR tests every year. We can generally complete up to ten in a day, depending on ground conditions; softer ground takes longer to test. Our test kit is fully calibrated and we can provide you with results on the day of testing. If you’d like to know more then please contact Steven Partridge – 01296 739413.
Heavy Lifting

There really is something quite hypnotic about watching very large aircraft taking off and landing, so our site team jumped at the chance of spending a few days carrying out soakaway testing at an RAF base.
It Pays To Check
Anyone who has served in the armed forces is probably familiar with the saying “time spent on reconnaissance is rarely wasted”. The civilian equivalent might be “prior planning prevents poor performance”. We think this is good advice and so we always do a comprehensive underground utility survey, including reviewing records held by the relevant utility companies, before breaking ground at any site. If you think this might seem overkill then we recommend that you click on this link.
If you’d like to know more about our underground utility surveys please contact Steven Partridge – 01296 739413
.
Out In the Cold

It certainly feels like autumn today. Both temperatures and leaves are falling; winter is coming!
So it seemed like the perfect time to take our latest set of surveying equipment out on site for a test drive. It may not look much but the TopCon DS103 Robotic Total Station is the very latest in precision survey kit, whether for carrying out topographic surveys prior to scheme design or for setting out on a construction site.
We’d be delighted to discuss any survey requirements you have. Please contact Steven Partridge – 01296 739413
Back to School
We were recently appointed to complete Geo-Environmental Investigations at two new school sites, to be constructed using the latest modular construction methods.

Our investigation involved 100m of linear drilling, environmental and geotechnical laboratory testing, over 50m of dynamic probing, soakaway testing, trial pits, CBR tests, Plate Bearing Tests, Topographic surveys, CCTV surveys and utility surveys. All the site works were completed within 3 days and reports issued within 2 weeks.
Surely that gets an A*!
It’s What You Can’t See….

We were asked to carry out an environmental ground investigation at a disused transport depot. Not surprisingly this identified diesel contamination at ~2m below ground level.
There was no sign of any obvious contamination source and given the site’s previuous use as a transport depot, we thought it likely that an abandoned below ground fuel tank might be present.
We therefore went back to the site and carried out a shallow trial pitting exercise which revealed……well, you can see for yourself.
A Draining Holiday?

It’s the holiday season and, if you’re about to head off for a week or two of bliss in the sunshine with the family, spare a thought for our field services teams. When we asked them if they fancied a midweek stay in a caravan park, they jumped at the chance. We might have omitted to tell them that they’d be busy all day completing soakaway testing for an extension to the caravan park.
Being the good sports that they are they completed four tests, all in accordance with BRE365, and our detailed report was issued to the client the following day.
Making a Splash
With warmer weather arriving, we received a timely request from Micasa to assist them with the design and construction of a swimming pool for a residential client. All in a day’s work for our Terrier drill rig, which is particularly suited to this work, having a small footprint and being able to pass through a standard doorway. The only problem: our site team were left imagining taking a refreshing dip in the pool, which won’t be completed for a few months yet.