The combination of restricted head room and a ‘confined space’ presents major obstacles to any site investigation. However, our Terrier rig was able to gain access and complete a geo-environmental investigation in such a space. Its quite amazing where this little rig can get.
Access was through a standard doorway working with an overhead ceiling clearance of
less than 30mm with the machine set up. Precision operation was required to ensure we completed five boreholes, each to 6 metres in depth, with SPTs every metre, all in a safe and efficient manner.
The nature of the confined space meant that exhaust gases from the Terrier’s engine had to be vented to an outside area. We used an extendable sectional exhaust pipe to ensure a safe working environment. But just in case we also carried out carbon monoxide monitoring to ensure our crew’s safety.
Even better, our work was completed without the need to close the car repair workshop we were working in. allowing our client to continue panel bashing, filling and spraying to his hearts content.