Greek Myth?

Comacchio Drill Rig
Comacchio Drill Rig

Actually, there is nothing mythical about Subadra being commissioned to install shallow monitoring wells at the Daedalus Airfield Development! We constructed several shallow wells over the course of two days using our Hollow Stem Auger drilling system.

Lee-on-Solent is known for its sand and a dense gravels which are more or less guaranteed to make drilling difficult. So to avoid this we used our powerful Comacchio drilling rig which ensure we reached the target depth at all the drilling locations with minimal disruption to the site. We then installed 50mm diameter wells to allow future groundwater sampling. All our materials were sourced locally to enable us to take the minimum of equipment and vehicles thus reducing our carbon footprint for the works.

We even had time to the collect soil samples for the Principal Contractor and get them
analysed for WAC by our in house lab facility. As a result of our prompt and efficient service the client retained us to carry out a more detailed geotechnical investigation at the site. No myth there then!